СТЕНОВЫЕ РАБОТЫ

The progress of wall installation in the upper zone has now reached 75% of completion. While the installation team installed the panels in the area, another team sealed the walls to stick them together with more strength. We will have more wall work for the next couple months because there will be new structure work completed, and further wall work will start once the structure is finished.

_00_01

(Above) An Overview of Wall Installation Work in the Upper Zone view from the outside

(Above) The Installation Team sealing the gap between the wall panel.

(Above) The Installation Team sealing the gap between the wall panel.

(Above) The Installation Team sealing the gap between the wall panel.

The view from the outside of the building after wall panel installation.

СТРУКТУРНЫЕ РАБОТЫ

Основная конструкция

The structure work of the middle zone building is still ongoing, we have also carried on with the bracing beam from last month. This month we will continue to construct the floor slabs of the buildings.

(Above) The bracing beam of this building now reaches to the 3rd level and the slab floor will start soon after this beam work.

(Above) At another building in the middle zone the scaffolding is installed on the top of the first floor slab which just had it’s concrete pillars poured, the scaffolding will support the 2nd floor slab of the building.

(Above) The form work of the 2nd slab floor will be installed on the top of the scaffold.  (right) The engineer was going to check and inspect the steel bar installation.

(Above) The post-tension sling installs after that and is ready for concrete pouring.

(Above) Another floor of the building in the middle zone pouring the concrete for its slab floor.

(Above) The workers clean the area on the slab floor which has already poured concrete.

_03_16

(Above) The staircase work started at the upper zone building.

Material Preparation

_04_01

(Above) The form work delivered to the site.

(Above) There is so much material preparation at the workstation to supply for the construction work.